- Title
- Construction material waste control success model for the construction industry
- Creator
- Musah, Abdul Razak
- Subject
- Construction industry -- Materials management
- Subject
- Construction industry -- Management
- Subject
- Construction industry -- Environmental aspects
- Date Issued
- 2024-12
- Date
- 2024-12
- Type
- Doctoral theses
- Type
- text
- Identifier
- http://hdl.handle.net/10948/68796
- Identifier
- vital:77114
- Description
- Economic sustainability and reconstruction in many economies rely heavily on the construction sector and remain strategic tools for governments and industries worldwide. Excessive construction costs and materials waste among some construction companies are rampant in the construction sector. Most of this waste is poorly managed, thus triggering significant project failure problems, leading to the project stakeholders losing the value of their investment. This concern advocate for effective control of construction material to avoid wastage. The primary objective of this study was to develop a Construction Waste Material Control (CWMC) model to be used by construction project professionals throughout the Project Management (PM) phases: initiation, planning, execution, monitoring, control and closure. Significant literature on construction materials waste, Project Management (PM) processes, and project performance regarding poor waste management and project failure was reviewed. This literature review was conducted to identify factors affecting Construction Waste Material Control (CWMC). These factors were identified and defined together with their respective contributions to the model. A quantitative survey instrument (questionnaire) was used to obtain information from construction sector professionals. A total of 213 questionnaire were received and administered for the study. Structural Equation Model (SEM) SEM was used to analyse the questionnaire data, and thereby assisting the research to clearly define latent constructs statistically significant to the (CWMC) model. The finding was that, the factors identified to have impact on CWMC are Project Initiation Phase Tools (PIPTs), Project Planning Phase Tools (PPPTs), project failure/success factors (PFFs), Project Execution Phase Tools (PEPTs), Project Monitoring and Control Phase Tools (PMCPTs), Construction waste material Control (CWMC) policy and Project Management (PM) competence. The supported hypotheses also authenticated these factors. Introducing the model into the construction sector provides another dimension to CWMC. By establishing the aforementioned factors, the model gives construction professionals precise CWMC predictive accuracy. As the model reliability test of 0.734 to 0.972 satisfied the theoretical threshold and goodness of fit of 0.912 of Normed fit index respectively. The model is the first of its kind and contributes significantly to the construction sector’s existing body of knowledge.
- Description
- Thesis (PhD) -- Faculty of Engineering, the Built Environment, and Technology, School of Built Environment and Civil Engineering, 2024
- Format
- computer
- Format
- online resource
- Format
- application/pdf
- Format
- 1 online resource (560 pages)
- Format
- Publisher
- Nelson Mandela University
- Publisher
- Faculty of Engineering, the Built Environment, and Technology
- Language
- English
- Rights
- Nelson Mandela University
- Rights
- All Rights Reserved
- Rights
- Open Access
- Hits: 44
- Visitors: 37
- Downloads: 1
Thumbnail | File | Description | Size | Format | |||
---|---|---|---|---|---|---|---|
View Details Download | SOURCE1 | Musah, AR.pdf | 3 MB | Adobe Acrobat PDF | View Details Download |