- Title
- Factors contributing to unsafe practices in Eskom power division projects
- Creator
- Dingilizwe, Nondumiso
- Subject
- Power-plants
- Date Issued
- 2021-03
- Date
- 2021-03
- Type
- Master's theses
- Type
- text
- Identifier
- http://hdl.handle.net/10948/59226
- Identifier
- vital:60314
- Description
- Health and safety is accepted as an integral element of the built environment. As construction within the electricity and power supply industry is inevitable, alongside other regulatory systems aimed at ensuring sustainable power supply, health and safety measures, policies, training, management, and incidences become important indicators for the delivery of power supply. This research study explores the health and safety management challenges that are experienced by the construction division of Eskom, South Africa’s national power utility with its head offices in Johannesburg, South Africa. The research explores and identifies factors that affect workers’ on-site behaviour regarding the compliance and adherence to health and safety statutory practices. Using a qualitative research method, and thematic data analysis, the research findings draw on salient emerging themes that allude to the inadequate and insufficient documentation of Eskom procedures, and the failure to make use of recorded past incidents in establishing improved pro-active health and safety management practice and management thereof, are but some of the illuminated factors that emerge from the study findings. For a power utility of its scale and the volume of electricity generation, transmission, and distribution, the compliance to internationally recognised health and safety standards within an appropriate legal framework, are factors that may hinder the successful implementation of its core function. Notwithstanding the fact that the electricity sector of industry, in terms of overall current health, safety and performance, is generally considered to be a lower risk than other industries within the South African economy. Yet this study, in taking cognisance of all four sectors of the energy and power value chain (generation, transmission, distribution and retail), attempts to address the unanswered questions if why and how Eskom, despite its health and safety policies and general compliance to statutory workplace health and safety framework, continues to experience a high level of workplace fatalities in the delivery of its projects. Against a backdrop of reported and documented incidences of time, this research found that the usage of reports to benchmark and re-calibrate policy and preventative procedure is carried out periodically, but in an unstructured manner. The risk this presents is evident in the potential failure to identify proper risk analysis, appropriate health and safety vi performance indicators, and a slow migration to the new ISO 45001 quality standard. Study findings also suggest a lack of training programmes for contractors and employees within Eskom construction projects, as a primary contributing hindrance factor to attaining an improved health and safety management system. Finally, the study also considered new hazards and risks that have, and may still, arise from the uptake and expansion of new technologies, cleaner energy, as well as future trends that would collectively influence health and safety standards along the electricity value chain. The research findings suggest for a more focused goal-setting and the building of competencies to recognise and mitigate risks, especially new risks, and to engage more participatory approaches to setting standards that can be effectively managed and which can contribute to injury reduction through behavioural change. What remains to be explored, will be the changing nature of doing business as the year 2020 witnesses a new confounding pandemic, the Coronavirus (covid-19). Its impact on health and safety in the workplace, and on the entire construction value chain, cost of construction, project management and timeframes, is yet to be determined and factored into the business processes of a large scale public entity such as Eskom.
- Description
- Thesis (MA) -- Faculty of Engineering, the Built Environment, and Technology, 2021
- Format
- computer
- Format
- online resource
- Format
- application/pdf
- Format
- 1 online resource (pages)
- Format
- Publisher
- Nelson Mandela University
- Publisher
- Faculty of Engineering, the Built Environment, and Technology
- Language
- English
- Rights
- Nelson Mandela University
- Rights
- All Rights Reserved
- Rights
- Open Access
- Hits: 284
- Visitors: 315
- Downloads: 46
Thumbnail | File | Description | Size | Format | |||
---|---|---|---|---|---|---|---|
View Details Download | SOURCE1 | Dingilizwe, N.pdf | 2 MB | Adobe Acrobat PDF | View Details Download |